Welcome to Oregonfirst.net.
Here you will find a brief summary of the BIG ENERGY backed LNG projects currently being proposed in Oregon.This imported foreign fossil fuel is to be piped through Oregon to OTHER energy markets (CALIFORNIA).
If we are unable to stop these projects, the Federal Agency tasked with approving them (FERC - Federal Energy Regulatory Commission) WILL approve them.
FERC approves every BIG ENERGY project that is submitted to them.
On this page:
- LNG - Why are we talking about LNG here in Oregon?
- Where does LNG come from?
- Natural gas prices?
- Why are we concerned about this?
- LNG - Why it is really not for Oregon
- What can you do for Oregon?
- LNG - Pipeline Factsheet
- Eminent Domain
- Oregon's total natural gas consumption is actually in decline!
- Nationally total natural gas consumption is not rising!
- US Natural Gas Imports 2002-2006
- Where is the natural gas consumption happening in the USA?
- Why have Oregon Law Makers REFUSED to take the point on this issue?
- Contact your state and federal representatives
- Why do these Energy Corporations misrepresent the danger of their proposals?
- What is Liquefied Natural Gas (LNG)
- What is Natural Gas?
LNG - Why are we talking about LNG here in Oregon?
Click on Image to view larger image
November 18, 2007
Two high pressure unscented natural gas (imported regasified LNG) pipelines and two foreign LNG import terminals with regasification facilities are now planned for north western Oregon. These two pipelines will run from these two large LNG import terminals on the Columbia River near Astoria through our homes, yards, farms, timber, fields, orchards, and other beloved land. Our land will be taken by these private energy corporations through the use of eminent domain. There are currently three different proposed projects in northwestern Oregon along the Columbia River and one in Coos Bay on the Southern Oregon coast.
Project I
Bradwood Landing LNG
Northern Star Natural Gas LNG, a Texas-based company that has never built a terminal or pipeline, has proposed the Bradwood Landing LNG receiving terminal and regasification plant on 55 acres of a 420-acre site at Bradwood, located between Astoria and Clatskanie at about River Mile 38 on the Columbia River. The facility would be designed to have a peak sendout capacity of
1.3 billion cubic feet per day of natural gas and would be capable of continuous operation.
The Federal Energy Regulatory Commission (FERC) has already reviewed their draft environmental impact statement and issued the opinion that the project would have “limited significant environmental impactsâ€, posing “no unacceptable environmental problems.†On August 29, the Clatsop County Planning Commission recommended approval of all the land use changes needed to build the terminal, against the recommendation of County Planning staff. The Clatsop County commission is now considering these changes. They met on November 7, 2007 and will continue discussing at a November 19 follow-on meeting and will make a final decision after conclusion of their hearing on this topic.
The proposed project also includes a 34-mile long pipeline that would run from the site to Port Westward and then under the Columbia River (crossing Puget Island) into Kelso, Washington and would connect to N/S pipelines supplying Washington and Oregon. This project has been under review for approx. 18 months at this time (Nov. 2007).
Project II
Palomar
Palomar is a joint venture of NW Natural Gas and TransCanada, which already operates the main international/interstate North / South Natural Gas pipeline going from Canada to northern California. The Palomar pipeline (phase 2) would transport imported regasified LNG from the proposed Bradwood Landing LNG import terminal 11 miles east of Astoria on the Columbia River. This 1500 psi pipeline will be 36 inches / 3 feet wide and would travel about 110 miles from the terminal to Molalla and from there another 110 miles east to Maupin Oregon (Wasco County) to connect to the large interstate TransCanada pipeline to feed California. The pipeline would run through the Coast Range to the Timber area, along Timber Road to Glenwood, through Gales Creek Valley, passing just west of Forest Grove to Gaston through rural Yamhill, Marion, and Clackamas Counties before ending in Molalla. If the Bradwood Landing LNG terminal is not built, the east half of the pipeline, from Molalla to Maupin (phase 1), could still be built as a new route to bring gas into the Willamette Valley. Both phases are under one project at this time. A FERC meeting for the proposed Palomar pipeline (intent for project filing was initiated for the EIS – Environmental Impact Statement) Oregon LNG project was conducted along the route Nov. 12-15, 2007, where many landowners shared their concerns with the project representative.

Project III
Oregon LNG
A second LNG terminal, regasification plant and pipeline have been proposed by Oregon LNG (owned by Leucadia Corporation group of investors based in New York), and is in competition with (both could be built) the NorthernStar terminal at Bradwood Landing. Oregon LNG was formerly the Skipanon Natural Gas Facility owned by Calpine, which went bankrupt and sold the project to Oregon LNG in January, 2007. Their terminal and processing plant would be in Warrenton, Oregon near Astoria, at the mouth of the Columbia river. The site is already leased and zoned for the facility. This would also be 36 inch a high pressure 1500 psi pipeline transporting unscented imported regasified LNG through Oregon to California. The pipeline would travel on a 117-mile route approximately parallel to the Palomar pipeline although, rather than going through Timber, it would go along Ridge and Strassel Roads and then through Glenwood, Gales Creek Valley, Forest Grove, Gaston, and cross rural Yamhill, Clackamas, and Marion Counties, on its way to the transfer station in Molalla. The two pipelines would be only 1 – 2 miles or less apart for most of the route, and their proposed locations are identical in some areas. A meeting about the Oregon LNG project was conducted by FERC in Forest Grove on September 19, 2007 for project filing was initiated for the pre-EIS phase of the project. At the meeting many citizens eloquently expressed their anger about the project and the damage it would do to their land, their property value, their livelihoods, and their communities.
The only reason to build the western half of the Palomar pipeline is to connect the Bradwood terminal to the TransCanada pipeline so that most of its gas can go to California. As noted above, NorthernStar already plans for a pipeline through Kelso to supply the Northwest, so the Palomar pipeline is not needed for that purpose. Northwest Natural Gas has indicated that it would buy only 1/10th of the output of the Bradwood Landing LNG terminal, and has stated that it could not support the Palomar pipeline by itself without other customers (that is, California energy companies).
California has already rejected five proposed LNG import
terminals. The Oregon pipelines are an “end run†to supply our more populous southern neighbor, because we are considered an easier target with less organized opposition.
Where does LNG come from?
Saudi Arabia and Qatar Natural Gas Reserves Available for LNG
Both Saudi Arabia and Qatar have very large reserves of natural gas and both countries are getting into the liquefied natural gas producing business. Qatar, with the third largest natural gas reserves in the world, is being very aggressive in developing an LNG industry when the small size of the country is considered. All together, about a dozen countries are shipping LNG as an export product.
Iran and Soviet Union Gas Reserves Available for LNG
Soviet Union and Iran rank among the top three countries in natural gas reserves and will no-doubt become leaders in the LNG export business over time. Four countries in the Atlantic-Mediterranean basin currently producing and exporting LNG are Algeria, Libya, Nigeria, and Trinidad.
The U.S. Department of Energy's Energy Information Administration provides estimates of LNG trade in 2002 as follows:
In 2005, Egyptian NG production outpaced consumption and it joined the LNG exporting countries.
Global LNG demand is expected to reach 500 bcm/year by 2015 and 635 bcm/year in 2020. The International Energy Agency estimates that imports of gas from Africa and the Middle East (mainly in the form of LNG) will quadruple by 2030.
Natural gas prices?
Are domestic natural and foreign UN-natural gas good sources of energy to commit our future too?
Natural Gas
Oregon wholesale natural gas prices rose 168 percent between January 1999 and July 2004. Over the same period residential rates rose 94 percent. These prices have not been adjusted to remove the effects of general inflation. The percentage increases for commercial and industrial customers fell between the wholesale and residential price increases.
Natural Gas Supply
Oregon imports 100 percent of its natural gas and receives it from British Columbia, Alberta, Wyoming, Colorado and New Mexico. Two connected interstate pipelines deliver the natural gas
The Williams Company’s Northwest Pipeline brings natural gas to Portland from British Columbia and the Rocky Mountain region of the U.S. British Columbia gas enters the U.S. near Sumas, Wash. and roughly follows Interstate 5. Gas from the Rockies comes into Oregon near Ontario. A lateral pipeline transports gas from Washougal, Wash. to the Portland area, the Willamette Valley and Grants Pass. Natural gas from Alberta arrives in a Gas Transmission Northwest (GTN) pipeline. It enters the U.S. near Kingsgate, Idaho, and moves through eastern Oregon, leaving the state near Malin, before traveling on to California and Nevada. A lateral line transports natural gas from Klamath Falls to Medford. The GTN pipeline is owned by TransCanada and connects with the Williams Northwest pipeline at Stanfield, Oregon.
Three natural gas utilities serve Oregon:
• Northwest Natural serves 80 percent of Oregon’s retail customers, including the Willamette Valley and the coast.
• Avista Corporation serves parts of southern Oregon and La Grande.
• Cascade Natural Gas serves parts of central and eastern Oregon.
Northwest Natural receives natural gas from the Williams’ pipeline. Northwest Natural owns underground gas storage facilities in Mist, Ore. and liquefied natural gas storage facilities in Newport and Portland. Northwest Natural also has contracts to use liquefied natural gas storage at Plymouth, Wash. and underground storage at Jackson Prairie, Wash.
Avista obtains natural gas from the Williams pipeline and the Williams-Grants Pass lateral as well as TransCanada’s main pipeline and Medford lateral.
Cascade customers from Madras to Chemult receive natural gas from TransCanada’s GTN pipeline. The Williams Northwest pipeline serves Cascade customers from Umatilla to Ontario.
Cascade and Avista either own or have contracts to use natural gas storage facilities.
Pipelines serving Oregon
Two natural gas pipelines serve Oregon customers. The Williams Company pipeline and the Gas Transmission Northwest (GTN) pipeline owned by TransCanada bring product from the Rocky Mountains and Canada. Pacific Gas and Electric National Energy Group formerly owned the TransCanada line.

www.oregon.gov/ENERGY/docs/Energyplan05.pdf
Why are we concerned about this?
We are trying to STOP these big energy companies from raping and pillaging Oregon and Washington and all the hard working citizens and land owners who live work and play here, all for the sake of big profit (11 billion in quarterly profits evidently isn't obscene enough) while supplying California with foreign gas. California has already soundly rejected 5 of these UNNEEDED dangerous, energy intensive regasification plants & their huge dangerous 1500 PSI (pounds per square inch, that is very high pressure) 36-inch pipelines (three feet, you can nearly squat down and walk through).
If we do nothing, our State and Federal Governments will force us into this.
We will be forced to subsidize these big energy companies with our stolen property value, and lost safety. We will sacrifice our life styles, our safety and our land, land that in most cases is the vast majority of the equity we have spent our lives building.
Our true economic losses will NEVER even be considered in this
process, let alone compensated for. Our thousands of
man-hours and thousands of dollars directly spent to fight this
will never be recovered. All of this involuntary sacrifice will be for private out of state corporate profits from a foreign petroleum product that Oregon DOES NOT NEED and it is not even going to be consumed here in Oregon.
The strongest argument I have heard supporting this LNG madness is a vague promise of new jobs and increased tax revenue it will provide. Aside from the 5 or 6 minimum wage gate security jobs, few if any of the other 20-40 permanent LNG jobs will go to locals. THESE jobs will be filled by out of state talent, just as the vast majority of the construction companies and workers jobs will. LNG is not going to provide "jobs" for Oregonians!
I have found a surprising number of friends, acquaintances and politicians to be mostly uninformed (as I was when this LNG nightmare was first thrust upon me) and somewhat ambivalent to totally undisturbed about the LNG/pipeline issue. That ignorance my friends, is exactly what they were counting on, it is the KEY to why these big money hungry petroleum companies are here in Oregon and Washington in the first place. They are COUNTING on us being ignorant and uninformed of the issues and ambivalent or totally undisturbed by their LNG\pipeline project. I ask you to step up and help us tell these petroleum companies in no uncertain terms, we
don't want their dangerous destructive California energy infrastructure here, and we will not subsidize their obscene profits. Tell them their hopes of slipping it by the ignorant UNINFORMED "backwoods" Oregonians and Washingtonians isn't going to work.
I urge you to talk to and share information with all your family, friends, neighbors, acquaintances and co-workers, anyone who looks at the whole picture on this LNG issue can't support it on any grounds, well unless they are a BIG petroleum company share holder. I believe if it is all laid out and they see what a raw deal this is for Oregon and Washington, they cannot help but join us in opposing LNG in our state.
I urge you to talk to and share information with all your family, friends, neighbors, acquaintances, co-workers, local media, newspapers and your local, state and federal public officials. Anyone who looks at the whole picture on this LNG issue
can't support it on any grounds, well unless they are a BIG petroleum company share holder. I believe if it is all laid out and they see what a raw deal this is for Oregon and Washington, they cannot help but join us in opposing LNG in our states.
I urge you to write email and call your Governor and you state and Federal lawmakers, explain to them what a raw deal this is for Oregon, ask them to step up and take the lead on opposing LNG in your state.
I urge you to write email and call your local newspapers and television and radio television news stations, explain to them what a raw deal this is for Oregon, ask them to step up and take the lead in opposing LNG in your state.
Please start an account here on this Bulletin Board and help by contributing whatever information or resources you can. You can read the postings without an account, but if you would like to post anything you will need an account. You may select any "available" user name, real or fictional. You must submit a functional email address though, so that you can receive the activation email and follow the enclosed link to activate your new account.
Thanks
Keith NO LNG
http://oregonfirst.net
LNG - Why it is really not for Oregon - NO LNG
The US Department of Energy - EIA - has demonstrated that there is no need for more natural gas in Oregon.
US government statistics show that the California and Oregon natural gas market may be
declining, not growing. Although the LNG developers message changes frequently, for the past year the LNG developer and their team members have stated that the market to be served is California and Nevada. Residents of Oregon must not be burdened with the risks of a catastrophic LNG event to enable the LNG developer to sell their product outside of the state of Oregon.
The sellers of natural gas to government entities, to electrical generating facilities, to commerce and industry, to business, and to residential consumers in the state of Oregon have stated, in writing, that more sources of natural gas are not required; and if one LNG import terminal facility were to be constructed in Oregon, at best, they could use a small part of one LNG facilities send out of natural gas. There are currently five large LNG import terminals proposed for Oregon. Not a single one is needed by Oregon.
Oregon currently consumes LESS THAN .75 billion cubic feet (most
days less than .25 billion cubic feet) of native North American natural gas per day.
The infrastructure that provides all of that natural gas and more is already in place here in Oregon. Each of these proposed LNG import terminals (regasification facilities) and their 36 inch 1500 PSI pipelines
will be sending 1.5 billion cubic feet of LNG derived foreign fossil fuel per day through Oregon into
California.
FERC has stated that the transportation of natural gas by pipeline involves some risk to the public in the event of an accident and subsequent release of gas. Why should the people or Oregon be told to accept this risk when LNG or another source of natural gas is not required in Oregon?
A new unnecessary 130 mile 1500 PSI 36" pipeline is proposed through hundreds of Oregonians private property and homes, to send LNG derived foreign fossil fuel natural gas to the California market, a market that may not exist when the LNG facility is completed because of California's planned use of alternative energy sources including 20% of the energy source being solar or wind power or other means prior to 2020.
In an attempt to gain the support of the people and local politicians, these dishonest LNG developers have misled the all Oregonians by promising lower natural gas rates to the people of Oregon when a LNG import terminal and pipeline are built. The state of Oregon agency that regulates natural gas rates and the sellers of natural gas in the state of Oregon have stated that the LNG developers can not promise lower rates to any single community; nor can they promise that siting a LNG facility in Oregon will result in any rate change in Oregon. Additional natural gas MAY stabilize - not reduce - the rates to Oregon residential consumers who have seen their rates increase by almost 40% in three years.
Does the energy industry have Oregon's best interest at heart? Do you believe the energy industry when they say Oregon needs to import more foreign fossil fuel?
What can you do for Oregon?
Governor Ted Kulongoski has certainly been busy, he seems to have plenty of time and effort to spend on his own pet projects, yet he cannot seem to bother himself to see that these three permits required by the federal Clean Water Act, Clean Air Act and the Coastal Zone Management Act required by all three of these LNG projects proposed in Oregon state are denied. These three permits are administered by the State of Oregon.
Please contact our Governor today and demand that he deny the federal Clean Water Act, Clean Air Act and Coastal Zone Management Act permits
for Bradwood Landing LNG/Palomar Pipeline, deny the federal Clean Water Act, Clean Air Act and Coastal Zone Management Act permits for
Oregon LNG, and deny the federal Clean Water Act, Clean Air Act and Coastal Zone Management Act permits for
Coos Bay LNG project.
DO not take no for an answer!
Governor Ted Kulongoski, absolutely has the authority and responsibility to stop this insanity in it's tracks. He MUST deny all three of these federal Clean Water Act, Clean Air Act and Coastal Zone Management Act permits for each of these LNG projects.
These out of state energy speculators "taking the state of Oregon to court" over it's denial of these permits is not a reasonable excuse for NOT denying all of these permits.
Contact Governor Kulongoski today tell him to DO THE RIGHT THING!
LNG - Pipeline Factsheet = NO LNG
Several of us on Ridge, Strassel and Timber Roads have received
letters asking permission to survey our property for planned
liquefied natural gas (LNG) pipelines. We have collected some
information regarding these projects and would like to share it.
Here are some key facts that may help to sort out this
information:
• Two LNG pipelines are now planned for our neighborhoods, both
running from large terminals in the Astoria area. Three other
LNG projects are also planned in Oregon, two more on the
Columbia River and one in Coos Bay on the Southern Oregon coast.
• The Palomar pipeline is a joint venture of NW Natural
Gas and TransCanada, which operates a large pipeline going from
Canada to northern California. This pipeline would transport
natural gas from the proposed Bradwood Landing LNG import
terminal 20 miles east of Astoria on the Columbia River. It
would be 36 inches wide and would travel about 110 miles from
the terminal to Molalla, and from there another 110 miles east
to Maupin (Wasco County) to connect to a large interstate
TransCanada pipeline to California. The pipeline would run
through the Coast Range to the Timber area, along Timber Road to
Glenwood, through Gales Creek Valley, passing just west of
Forest Grove, and through or near Gaston, Yamhill, Carlton, and
Woodburn before ending in Molalla. If the Bradwood terminal is
not built, the east half of the pipeline, from Molalla to
Maupin, could still be built as a new route to bring domestic
natural gas into the Willamette Valley; this portion of the
pipeline has been under discussion for several years.
• The Bradwood Landing LNG terminal and processing plant
is a project of NorthernStar Natural Gas, a Texas-based
company that has never built a terminal or pipeline. The Federal
Energy Regulatory Commission (FERC) has already reviewed their
draft environmental impact statement (DEIS) and issued the
opinion that the project would have “limited significant
environmental impactsâ€, posing “no unacceptable environmental
problems.†The comment period on this DEIS ends on December 24,
2007. On Aug. 29, the Clatsop County Planning Commission
recommended approval of all land use changes needed to build the
terminal, against the recommendation of County Planning staff.
The Clatsop County commission is now considering these changes
and will make a final decision in the next month or two. A
shorter, 35-mile pipeline is included in this project; it would
go under the Columbia River to Kelso, Washington where it would
connect to the Williams pipeline that supplies Washington and
Oregon.
• The only reason to build the western half of the Palomar
pipeline is to connect the Bradwood terminal to the TransCanada
pipeline so that its gas can go to California. As noted
above, Bradwood Landing already has plans for a pipeline through
Kelso to supply the Northwest, so the Palomar pipeline is not
needed for that purpose. Northwest Natural Gas has indicated
that it would buy less than 1/10th of the output of the Bradwood
terminal, and has stated that it could not support the Palomar
pipeline by itself without other customers (that is, California
energy companies). California has rejected four proposed LNG
import terminals (but is now considering two others). The Oregon
pipelines are an “end run†to supply our more populous southern
neighbor, because we are considered an easier target with less
organized opposition.
• A second terminal and pipeline have been proposed by Oregon
LNG (owned by Leucadia Corp. based in New York), and
is in competition with the NorthernStar terminal. Oregon LNG was
formerly the Skipanon Natural Gas Facility owned by
Calpine, which went bankrupt and sold the project to Oregon LNG
in Jan. 2007. Their terminal and processing plant would be in
Warrenton at the mouth of the Columbia. The site is already
leased and zoned for the facility. The pipeline route, rather
than going through Timber, would go along Ridge and Strassel
Roads but then would closely parallel the Palomar route through
Glenwood, Gales Creek Valley and Forest Grove all the way to the
transfer station in Molalla. The two pipelines would be only
1 – 2 miles apart for most of the route. Like the Palomar
pipeline, it would then connect to a Molalla-to-Maupin pipeline
to connect to the interstate TransCanada pipeline. A meeting
about the Oregon LNG project was conducted by FERC in Forest
Grove on Sept. 19. At the meeting many citizens eloquently
expressed their anger and fears about the project and the damage
it would do to their land, their livelihoods and their
communities, as well as their frustration with the lack of
information or notification about the hearings from either
Oregon LNG or FERC.
The FERC Review Process
• LNG projects are evaluated and approved by FERC, the
Federal Energy Regulatory Commission. The members of FERC
are appointed by the President. Since the passage of the Energy
Policy Act of 2005 (EPACT), FERC has essentially all the
power to evaluate LNG projects and decide if they can be built.
In the past projects would have been evaluated by the Oregon
Energy Facilities Siting Council. Now states and local
jurisdictions have no role in evaluating projects and very
little legal power to block or modify them. There are just
three exceptions: states can attempt to block projects based on
the Clean Air Act, Clean Water Act or Coastal Zone Management
Act.
• The first part of the FERC evaluation process, leading up to
an Draft Environmental Impact Statement (DEIS), is “scoping,â€
that is, determining what issues need to be addressed in the
DEIS. There have been scoping hearings on both pipelines, where
FERC took testimony about the specific impacts of the pipeline
on the environment, cultural and historical resources, and
economic and recreational activities. At these hearings it was
important to bring up any and all issues that FERC needs to
consider. However, we have not been provided with adequate maps
to comment on the specific route the pipeline will take, or the
siting of pumping stations along the route. After the scoping
hearings and (very short) comment period, FERC takes a few
months to prepare the DEIS.
• Once the DEIS is issued, we then have a short time to respond
to it before a final Environmental Impact Statement is issued.
For the Bradwood terminal, FERC only allowed 45 days for
responses to its DEIS (the short comment period is a provision
of the 2005 Energy Policy Act to “streamline†reviews). U.S.
Representative David Wu repeatedly demanded a longer time for
comment, and finally, after he refused to take “no†for an
answer, they extended the comment period to this December 24th.
A similar process will probably play out for the Palomar
pipeline.
• FERC is doing no overall assessment of the need for imported
LNG, the total number of terminals and pipelines that might be
necessary, or the best sites. The U.S. currently has 5 LNG
terminals, including one in Alaska. Since 2005, proposals have
been made for an additional 45 terminals, including 5 in Oregon.
The current process of reviewing all of them one at a time, with
no overall strategic planning, means that companies are racing
each other to be the first to gain approval and thus reap huge
profits. FERC’s definition of “need†appears to be the existence
of customers willing to buy the gas.
The Impact on Landowners in the Pipeline Path and on Our
Neighborhoods
• By Federal law, land can be taken for LNG pipelines by
eminent domain, against the wishes of landowners. If a
mutual agreement cannot be reached between the pipeline company
and the landowner, a judge will decide what compensation the
landowner will receive. Compensation is not based on the full
value of the land—it is not for purchase of the land but only
for an easement, which typically is worth about 10% of the land
value (and the landowner continues to pay the property tax). In
similar cases in southern Oregon, landowners received “pennies
on the dollarâ€. This does not take into consideration that a
pipeline corridor may alter or restrict use of the entire
property, cut it in half, and/or in many cases make it
impossible to continue previous activities such as farming and
timber management. Furthermore, with a pipeline in place or even
planned, property values will plummet and land will become
unsellable. Some landowners have been told they could not get
insurance. The result for many will be loss of their livelihood
and life savings. It strikes us as an extraordinary abuse of
power that two competing, privately owned corporations can use
the power of the federal government to seize our land against
our will for the purpose of profit, not for the greater good of
the community. Before eminent domain can be used, FERC must
issue a “Certificate of Public Necessity.†We see no such
necessity for building these pipelines. They amount to use of
eminent domain for private gain.
• The pipelines would take a permanent 60-foot-wide easement
(twice the width of Route 6) that would be logged, cleared and
maintained by the company, with access rights at any time.
During construction they would clear a temporary easement of
about 120 feet (the width of the sections of Sunset Hiway with 4
lanes and a center median). No trees or perennial crops could be
replanted, but invasive weeds will proliferate. In other places
the easements were sprayed with herbicides to control brush.
Furthermore, once a pipeline is built and the route established,
additional pipelines could be built alongside it—something that
has happened elsewhere. One of our neighbors personally
witnessed this in New Jersey, where one pipeline was expanded to
five over the same route within a few years, with ever-wider
“easements†taken from the landowners.
• Both pipelines will be 36 inches in diameter. In the case of
the Oregon LNG pipeline, it is planned to be just 3-5 feet
underground. Pipelines are known to spontaneously rupture and
explode with disastrous consequences. A few years ago, two boys
in Washington state were killed by an exploding gas pipeline,
and a pipeline exploded and started brush fires in Port Arthur,
Texas this October. The natural gas in a pipeline is under very
high pressure, so a rupture would cause a large explosion and
fireball, with obvious results if such an event occurred in a
forested area in the summer. According to a September article in
the Argus, there have been 866 natural gas pipeline accidents in
the U.S. since 2000—about 1 every 3 days. Recently in Mexico
gangs have been blowing them up on a regular basis. Our local
communities do not have adequate fire and emergency services to
cope with this level of disaster.
• The pipeline route is unsafe because much of the proposed
route is through steep hillsides with unstable soils. Our area
regularly has landslides that block our roads. The route would
also cross several critical streams and rivers that are prime
salmon habitat.
• No natural gas from the pipeline would be available locally;
it can’t be tapped from a high pressure pipeline.
The Need for Natural Gas
• Does Oregon need this natural gas? Oregon’s current usage
of natural gas is 0.7 bcf/d (billion cubic feet per day). Each
of the proposed pipelines would have a capacity of 1.3 - 1.4 bcf/d;
so just one of them would triple Oregon’s gas supply! In
contrast, increases for demand in the Northwest are projected to
be quite small and can be met by the state’s initiative to
increase use of renewable energy. It is obvious that these
pipelines would bring in an excessive supply of natural gas that
is not needed. Oregon Senate Bill 838 was passed on June 6,
2007, and mandates that Oregon utilities get 25% of their energy
from renewal sources by 2025. Meeting this target would take
care of Oregon’s future energy needs. An oversupply of natural
gas would undermine Oregon’s law and energy policy, and would
divert resources from the urgently needed development of
renewable energy sources that promote independence and lessen
global warming.
• Does California need this natural gas? (assuming that we are
willing, as self-sacrificing neighbors, to let our land be
destroyed to provide it.) The 2006 California Gas Report,
released by a consortium of California gas and electric
utilities, projects that demand in California will decrease
through 2015. An LNG terminal has already been built and will
become operational in January 2008 at Costa Azul, Baja Mexico
that will transport gas via pipeline to California; an expansion
and extension of the California pipeline has already been
approved. The state’s Lieutenant Governor has stated that this
will provide all of the state’s natural gas needs for the
foreseeable future, and furthermore has said that the plan to
bring LNG to California through the Oregon “back doorâ€
undermines California’s priorities and energy policy, including
its aggressive programs to promote conservation and renewable
energy sources.
Broader Negative Impacts of LNG Import Terminals and
Pipelines
• The proposed pipelines would be needed specifically to
transport imported LNG. Our country has a stated goal of
reducing our dependence on imported energy. Imported LNG does
not reduce this dependence but rather perpetuates it. The major
sources of LNG would be Indonesia, Algeria, Nigeria, Russia and
Qatar; Iran has some of the world’s largest reserves. These are
not the most stable countries or our best allies. Therefore
supplies and costs of LNG would be unstable, and we could be at
the mercy of numerous political and economic factors, just as we
currently are for our supply of imported oil.
• Imported LNG will not reduce the cost of natural gas to
Oregonians. Because of the cost of transportation, security and
processing, it is more expensive that domestic natural gas. Its
cost is not determined by local supply but by global supply.
Right now the LNG supply is less than the demand. Europe and
Asia are currently outbidding the U.S. for LNG, so that
terminals that have already been built are unable to obtain a
supply and are sitting idle or operating far below capacity.
This means that the cost of imported LNG will be high if we can
get it.